EWaste Disposal Inc. specializes in environmentally responsible disposal and remediation services, including lead-based paint cleanup. At Camp Pendleton Marine Base, they would likely be engaged in removing and remediating areas where lead paint has been used in older buildings, barracks, or other structures. Such work is crucial for ensuring the health and safety of military personnel and reducing environmental hazards.
The cleanup process typically involves:
Assessment: Identifying areas contaminated with lead-based paint through testing and inspections.
Containment: Setting up controlled zones to prevent the spread of lead dust during removal.
Removal: Using specialized equipment to strip and safely remove the lead paint from surfaces.
Disposal: Transporting the hazardous waste to certified facilities for proper disposal, following EPA and other regulatory guidelines.
Verification:
Conducting final tests to ensure the site is free from lead contamination.
If you need specific details about EWaste Disposal Inc.’s work at Camp Pendleton, it would be helpful to review project reports or contact the company directly for their methods and outcomes.